Axarquia.app

Directory · Builders and reforms

Builders, reforms and home repairs in the Axarquía

Most small jobs here cost about €20-40 an hour plus materials, and a full reform runs from roughly €400 to €1,200 per m². Almost any work beyond painting a room needs a paper filed at the town hall first, plus a small tax. Get a written quote, pay by card or transfer against a proper invoice, and you can usually pay 10% IVA instead of 21%.

Last updated: 2026-10-21

What trades charge in 2026

These are national guide prices from price surveys, mostly from the quotes platform Habitissimo (updated June to September 2026). They are labour only unless stated, and they vary a lot with the job, the season and how far the trade has to travel. Use them to spot a quote that is far out, not as a fixed tariff.

TradeTypical rateSource
Builder (albañil)€18-35 an hour, average about €25; a labourer (peón) about €20. For Málaga, Habitissimo gives about €15-20 an hour or around €80 a dayHabitissimo, June 2026
Plumber (fontanero)€15-100 an hour; €20-50 in rural areas; urgent call-outs €90-150 an hourInfobae, March 2025, citing Occident
Electrician (electricista)€15-75 an hour, average about €35; travel charge about €15-30; out-of-hours emergencies €100-200Habitissimo, June 2026
Painter (pintor)€20-40 an hourHabitissimo, September 2026

Call-out and minimum charges: many trades charge a travel fee (desplazamiento), sometimes €0.50-1 per km, or a minimum of around €50 for a job under an hour. Nights, weekends and holidays can cost up to double. Ask before they come out.

What a reform costs per m²

JobTypical priceSource
Full reform of a flat or house€400-600 per m² (basic to mid quality); €800-1,200 per m² (high quality). A 100 m² flat: about €40,000-60,000 mid qualityHabitissimo, September 2026
Bathroom, about 6 m²About €5,500 in totalHabitissimo, September 2026
Kitchen, about 8 m², with units and appliancesAbout €10,000 in totalHabitissimo, September 2026
Kitchen and bathroom togetherAverage about €8,500 (range €4,000-12,000); for Málaga about €500-1,200 per m²Habitissimo, September 2026
Painting a flat, white plastic paint€10-12 per m² of floor area, up to €15 in colour; an 80 m² flat about €1,000. Habitissimo's Málaga figure is €3-8 per m²Habitissimo, September 2026
Wall tiling (alicatado)About €30-55 per m² with mid-range tiles, average €40; labour alone from about €15 per m²Habitissimo, September 2026

Old village houses often hide surprises: damp, weak roofs, no proper drains. Keep 10-15% of your budget spare.

Licences: obra menor, obra mayor and the town hall

In Andalucía the rules come from the planning law LISTA (Ley 7/2021) and its regulation (Decreto 550/2022). In everyday terms there are three routes:

Nerja: what counts as small works

Nerja's form for small works in town covers interior painting, plastering, new floors and wall tiles, false ceilings, replacing bathroom fittings, interior doors, small repairs to installations, and repairs to a private pool. It does not cover moving walls, structural work, façades, changes of use or anything needing a project. You attach photos, an itemised budget, a waste plan, and proof that you have paid the inspection fee, the ICIO tax and a waste deposit. A skip on the street needs its own permit.

Vélez-Málaga, Torre del Mar, Torrox and the villages

The same Andalucía-wide system applies everywhere, but each town hall has its own forms, fees and online office (sede electrónica). Ask the urbanismo department, or ask your builder to file it for you. Ask to see the stamped copy before work starts.

ICIO and fees: the tax on building work

Almost every job filed at the town hall pays the ICIO, a council tax on the cost of the work (labour and materials, without IVA). Spanish law caps it at 4%.

Building without a licence, and the rural land problem

Much of the Axarquía campo is rural land (suelo rústico, formerly suelo no urbanizable). Over the years many houses, extensions, terraces and pools were built there without permission. That matters to you as a buyer, a seller or an owner planning work.

Before you buy, extend or rebuild in the campo, ask an independent lawyer or architect to check the planning status at the town hall. See also our guide to holiday lets and selling a home.

IVA: 10% or 21%?

Repairs and renovations to a home can be charged at 10% IVA instead of 21% when:

New from 1 December 2026 (Real Decreto-ley 29/2026): you must pay by card, bank transfer, a cheque in the builder's name or a payment into their bank account, or the 10% rate is lost. The same change extends 10% IVA to homes let as someone's main residence. Splitting one job into separate invoices for materials and labour doesn't get round the 40% rule, and appliances and servicing (for example yearly boiler checks) stay at 21%. A gestor can confirm your case.

Quotes, staged payments and invoices

Electricity and gas: certificates and checks

Insurance and guarantees

Complaints and your consumer rights

  1. Talk first, then put the problem in writing (email or WhatsApp is fine) with photos.
  2. Hoja de reclamaciones: every business must give you an official complaint form, free and on the spot, if you ask. You can also download it from Consumo Responde or file it online with a digital certificate. The business has 10 working days to reply.
  3. No reply, or a bad one? Take the form to your town's consumer office (OMIC) or the Junta's Consumo service in Málaga. They will try to mediate.
  4. Consumer arbitration: free, voluntary and binding, but only if the business has joined the scheme. Ask before you hire.
  5. Consumo Responde: 900 21 50 80, Monday to Friday 8:00-20:00, Saturday 8:00-15:00. For larger sums, see a lawyer.

Filing online is easier with a digital certificate or Cl@ve.

Red flags and scams

Find one near you

Sources

Questions people ask

How much does a builder charge per hour in Spain in 2026?

National surveys put an albañil at about €18-35 an hour, average around €25, plus materials. Habitissimo's Málaga figure is lower, about €15-20 an hour or €80 a day. Prices vary, so get written quotes.

Do I need a licence to redo my bathroom in Vélez-Málaga or Nerja?

Usually not a full licence, but you do need to file a declaración responsable at the town hall and pay the ICIO tax and fees before starting. Moving walls or touching the structure needs more.

What is the ICIO tax in Vélez-Málaga?

3.5% of the cost of the works (labour and materials, without IVA), paid when you file. The legal maximum in Spain is 4%.

Can I pay 10% IVA on renovation work?

Yes, if you are a private person, the home is at least two years old and materials supplied by the builder are no more than 40% of the price. From 1 December 2026 you must also pay by card, transfer or cheque, not cash.

How much does a full reform cost per m²?

About €400-600 per m² for basic to mid quality and €800-1,200 per m² for high quality, according to Habitissimo (September 2026).

What is AFO and does it make my house legal?

AFO is a recognition for older buildings on rural land built without a licence more than six years ago. It allows use, maintenance and help with utilities, but it is not full legalisation and doesn't allow extensions.

How do I complain about a builder in Andalucía?

Ask for a hoja de reclamaciones; the business has 10 working days to reply. If it doesn't, take it to your OMIC or Consumo in Málaga. Help line: Consumo Responde 900 21 50 80.

Is the 5-yearly gas check a scam?

The check itself is real, but the distributor tells you the date in advance and bills it, so you never pay at the door. Unannounced callers demanding cash are a known scam.

Spotted something out of date? Tell us